Titan was contacted by an existing client who is an insurance broker we were asked could we look at a job where some Victorian railings had been severely damaged due to an RTC up in Carlisle Cumbria.
Having carried out a site survey the challenge was to reclaim as much as we could of the Victorian rail top finials and any other parts of the railings, due to the railings being frontal to a listed building it was paramount that we have the completed works to the same finish prior to the RTC.
Challenge completed, our fabrication team did a fantastic job and our client was over the moon with the fished project.